(937) 246-1414

Metal Roofing FAQs & Resources

If you are new to MASTER Building Components, you will soon learn that we like to make friends, not customers. That’s why we’ve put together the answers to the metal roof questions we hear most often and resources to help you care for your new metal roof up front. Of course, we are always here for you if you have questions now or in years to come.

Frequently Asked Questions & Answers

Do metal roofs leak?

A properly installed roofing system should never leak! Remember to choose an installer that is well trained and has experience installing metal roofing. ANY roofing material (shingles, slate, wood, or metal) improperly installed could lead to leaks or roof failure.

Will hail damage a metal roof?

While in extreme cases, there could be some slight denting that occurs, metal roofing is still the recommended material choice in areas that receive hail often. Did you know that hail can cause damage to conventional roofing materials? Hail can cause shingles to break, split apart or tear-off completely whereas they will not penetrate a metal roof.

What is the cost of metal roofing vs. conventional shingle roofing?

While metal roofs are more of an investment upfront, they outlast traditional shingle roofing by far. On average, you can expect to pay 16% more per square foot than a 20-year asphalt shingle roof. However, compared to more decorative shingle options, a metal roof system is very comparable.

Will the noise of rain on a metal roof be unbearable?

With proper installation, combine with interior insulation and drywall, a metal roof in the rain does not increase noise significantly over a traditional shingle roof.

What tools are necessary to install metal roofing?

If you are a DIYer, you may need to invest in some tools beyond what you have on-hand at home. You may require a screw gun, cordless drill, metal cutting snips, and tape measure. Give us a call at 937-246-1414 if you have additional questions.

When my metal roof arrives, how should I handle and store panels prior to installation?

It is very important to handle your new metal roof panels with care so that the painted finish is not damaged before installation. While tough with impact resistance, dragging panels across the surface of one another could scratch and damage the finish. To further protect you and your metal roof, use heavy-duty gloves when handling panels and trim accessories.

Upon receipt, inspect your metal roof panels for moisture. If there is moisture, the panels should be separated and dried. During installation, remember to use extreme caution when walking, sitting, standing or kneeling on metal roofing to avoid falls. Due to oil used in the manufacturing process, metal roofing panels are extremely slippery when wet.

Can insulation be added under metal roofing?

Yes. We recommend foil-backed, single-bubble insulation that can be used under metal roofing. Bubble insulation has an R-value of 3 and it blocks 97% of radiant heat energy. Using a radiant barrier with a properly ventilated home saves you money for years to come.

How is metal roofing attached to my pole barn or other structure?

Since metal roofing is available in a variety of exciting colors and finishes, it is attached to your pole barn or structure using coordinating, color-matched screws and rubber washers to prevent leaking.

Do existing shingles need to be removed prior to installing a metal roof?

In most cases, no, since metal roofing is lighter than shingles. Save money, time, and the work of removing old shingles! Please refer to local building codes before you begin installation.

Why should I choose a metal roof over traditional shingles?

There are three reasons you should choose metal roofing for your next project: (1) energy efficient, (2) lightweight, and (3) long lasting! Unlike traditional shingle roofs, metal roofing systems come in a variety of colored coating, resist the growth of mold, mildew, and fungus, are strong in inclement weather and high winds, and require little maintenance!

Register

*Company Name
*Owner's Name
*Address
*City
*State
*Zip
*Phone
Cell Phone
Fax
*E-mail
*Average number of barns built per year
Terms and Conditions
  • Payment Terms
    • All payments are due NET30 or at time of order (credit approval required)
    • MASTER will accept cash, check, credit cards, or wire transfer
    • Declined checks are subject to a $50.00 NSF Fee
    • Tax-exempt certificates are required to be on file
  • Complete Barn Packages Include
    • Code Compliant Wood Trusses (4/12 Pitch, 4 O/C)
    • Treated Eave Post (8', 10', or 12' OC)
    • Treated Full-Length Gable Posts (Max 12' O/C)
    • 2x8 Treated Skirt Boards (1 Row)
    • 2x4 or 2x6 Wall Girts (24" O/C)
    • 2x4 Roof Purlins (24" O/C)
    • Code Compliant Top Girt Truss Carrier
    • Temporary Post Bracing
    • Truss Blocks
    • Treated Cleats at Base of Post for Uplift Protection
    • Precast Concrete Footers (Concrete Mix for Larger Buildings)
    • 29 Gauge Painted Galvalume Roofing, Siding, and Trim
      • 40-year Paint and 25-year Corrosion Warranty
      • Metal Trim Components
        • Ridge Cap
        • Foam Closure Strips under Ridge Cap
        • Gable Trim
        • Eave Trim
        • Outside Corner Trim
        • J-Channel
        • Rat Guard
        • Touch-Up Paint
        • 1-1/2" Painted Roofing and Siding Screws
        • 2" Painted Screws for Ridge Cap
        • 16D Framing Nails
        • 3” Galvanized Framing Nails
        • 40D Ring-Shank Truss Carrier Nails
        • 1-1/2" Rafter Tie Nails
        • Simpson H2.5 Rafter Ties
  • Material Replacement
    • It is the responsibility of the Retailer’s customer (“Owner”) to receive the barn package when it arrives
    • All materials must be counted and visually inspected immediately for missing or damaged material, and reported to MASTER within 24 hours of delivery
    • Any un-exposed damaged material must be reported within two weeks of delivery
    • MASTER utilizes reasonable measures and methods to replace missing and/or damaged materials
    • Material missing or damaged at the time of delivery will be replaced at MASTER's expense
    • Hidden missing or damaged material resulting from MASTER error and reported within two weeks of delivery will be replaced at MASTER's expense
    • All other material losses or damage will be replaced by MASTER at the Retailer’s request and expense
    • Any damage material claims must be supported with photo or video proof
    • MASTER cannot be held responsible for any damage or theft of materials occurring after delivery.
  • Documentation
    • Owner is responsible for checking and meeting all local building laws, regulations, and codes
    • MASTER highly recommends that the Owner pre-purchase drawings and acquire building permits prior to purchasing any pole barn package where permits are required
    • Pre-purchased drawing cost will be credited at the time of material purchase
    • MASTER will supply a barn rendering and a post layout of the barn with door and window locations, along with color selection for final Retailer’s approval ("Approval")
    • MASTER will not order the materials until the barn rendering and post layout have been Approved (by fax or email) by Retailer
    • No changes to the order can be made after Approval
    • Anytime you get the building department involved, you stand the chance of there being changes to the originally quoted barn. Our prices are based on generally accepted building principals. However, there are some jurisdictions have additional requirements. When this occurs, there may be necessary price changes.
  • Shipping & Delivery
    • MASTER will use commercially reasonable efforts to make delivery within four (4) weeks from the date of approved layout
    • The Retailer understands that this delivery may be delayed due to factors outside of MASTER's control
    • In such an event, MASTER will keep the Retailer up to date with the expected delivery date
    • Deliveries are made utilizing up to a 70-foot-long tractor trailer
    • If desired placement for materials cannot be safely accessed by a tractor trailer, Retailer must provide an alternate safe placement location
    • Ultimately, placement of materials is at the full discretion of the delivery driver
    • Trucking Company uses commercially reasonable efforts to avoid any property damage, but some damage to Owner’s property might inadvertently occur
    • MASTER and/or Trucking Company shall not be held responsible for claims arising from minor damage to yards, driveways, fields, gardens, etc.
    • Trucking Company must be able to unload materials at the stated locations without obstruction within three (3) hours of arrival
    • Detention of the Trucking Company beyond the allotted time, whether due to lack of ingress/egress, space to unload, or other obstacles/limitations, will be subject to a $100 per hour fee
    • Retailer also releases MASTER and Trucking Company from all costs and damages caused by handling materials after delivery
  • Building Requirements
    • Material and components are provided in quantities and sizes to meet the specific needs of the barn as shown in MASTER provided construction drawings
    • It is imperative that the Owner builds the barn to MASTER’s specification as provided in drawings
    • Any deviation without MASTER's prior written approval will void any product warranty or responsibility for MASTER to provide replacement material
    • MASTER pole barn kits are based on a general knowledge of standard building codes
    • Owner is responsible for checking and meeting all local building laws, regulations, and codes
  • Refunds and Returns
    • Each and every pole barn package is custom designed and manufactured. With this in mind, there are limited opportunities for full refunds. We will do our very best to assist you in the event a refund or return is requested.
    • Our policy is to refund the entirety of your investment, less any costs incurred for professional fees and bank or credit card fees, within 24 hours of the Retailer’s approval of the design.
I agree to the Terms and Conditions
*Required

23 Whatever you do, work at it with all your heart, as though you were working for the Lord and not for people.
24b For Christ is the real Master you serve. (Col. 3:23,24b)